The Municipality
of Anchorage (MOA), Project Management and Engineering
Department (PM&E) is proceeding with a project to
complete the 100th Avenue corridor between Minnesota
Drive and C Street.
The east/west
traffic corridors south of Dimond Boulevard are limited
between the Old Seward Highway and Minnesota Drive.
As a result, Dimond Boulevard is frequently congested
with a high volume of traffic causing significant traffic
delay.
This project
will complete the connection of 100th Avenue to the Old Seward Highway. This will improve access to business areas south of Dimond
Boulevard and reduce congestion on Dimond Boulevard.
The 100th Avenue extension project will include pavement,
possible curb and gutter, street lighting, storm drainage,
a multi-use pathway, sidewalks, and landscaping.
Design is scheduled to take place from the summer of 2010, to the summer of 2011.
Right-of-Way acquisition is scheduled for the fall of 2010, through the fall of 2011,
and construction will beging early summer of 2012 |